With summer here, I have not had as much time to work on this brewing stand as I would have like. One thing I realize is that all the custom made brackets are taking up serious time. Thank goodness most are now completed.
As of this update, I have added the pump mount to the stand. The mount includes tapped threads. I have also completed the mounting of the high pressure banjo burner.
The low pressure jet burner has been mounted. On my old Brutus Ten clone, the jet burner didn’t have any support brackets. They were simply supported by the black gas pipe. On this build, I want to make sure every component is securely fastened. I will provide more detailed images once the stand goes to paint. This burner will eventually be connected to a propane gas valve. The mounts for the gas valve have been designed but still need to be installed.
Read original blog post